minus-squareRizzoTheSmall@lemm.eelinkfedilinkEnglisharrow-up1·5 days agoWhat’s not covered is the 25 years of R&D in advance of waterfall project starting, or that it’s delivered 200% over time and cost due to those requirements being insufficient and based on assumptions that were never or are no longer true.
What’s not covered is the 25 years of R&D in advance of waterfall project starting, or that it’s delivered 200% over time and cost due to those requirements being insufficient and based on assumptions that were never or are no longer true.